eVisa lines at DEL
We arrive from the UK at 1:15am at DEL airport. Has anyone had experience with the eVisa lines there recently? We are connecting to Guwahati in the other terminal and I've read an older post saying it took them 3 hours. Thanks, any info would be greatly appreciated.
|
We visited about 18 months ago also flying into Delhi from UK so this is a little out of date however, at that point, E visa lines were non existent and it took about five minutes for each of us to have our fingerprints taken and for the visa to processed before we proceeded onwards. All very calm and efficient.
|
Ioncall, thanks for the info. We hope to have a similar experience.
|
Short line
we arrived Feb 1/18 from Toronto and had a very short line. Make sure you pick up the form you need to fill out on arrival before you get in line- also have an address of first hotel with you to fill out.
|
jft, thanks for relaying your experience and for the tip about getting the needed form and having the hotel's address handy.
|
All times are GMT -8. The time now is 11:50 PM. |