Old Oct 10th, 2007, 02:10 PM
  #1  
Original Poster
 
Join Date: Aug 2006
Posts: 2,254
Likes: 0
Received 0 Likes on 0 Posts
Boeing 787 Dreamliner - will it ever fly?

Last month, Boeing said it was delaying the first flight of the 787 Dreamliner until some time between mid-November and mid-December. Now it has been put back to the end of the first quarter 2008, with first deliveries at the end of the year.

Are there serious problems which will prevent the plane ever getting off the ground? Will the number of new orders now slow down? Is this good news for Airbus?

Is the Dreamliner a nightmare?
chartley is offline  
Old Oct 10th, 2007, 02:44 PM
  #2  
 
Join Date: Jan 2003
Posts: 12,885
Likes: 0
Received 0 Likes on 0 Posts
Boeing is still promising on time delivery. They did admit that the flight tests will need some extra time but they are confident that the delivery will be on time.

Assuming that they are doing some "window dressing" and the testing takes some extra time, the worst case scenario is about 3 months.

Far from a nightmare on a totally new design.

Airbus is 3 years behind schedule with the 380.
AAFrequentFlyer is offline  
Old Oct 10th, 2007, 03:17 PM
  #3  
 
Join Date: Jan 2003
Posts: 12,885
Likes: 0
Received 0 Likes on 0 Posts
It looks like 6 month delay:

<i>The Boeing Company [NYSEA] today announced a six-month delay in its planned initial deliveries of the 787 Dreamliner due to continued challenges completing assembly of the first airplanes.

Deliveries of the strong-selling Dreamliner are now slated to begin in late November or December 2008, versus an original target of May 2008. First flight is now anticipated around the end of first quarter 2008.

The company said the financial impact of the delay would not be material to earnings and that its earnings guidance for 2007 and 2008 remained unchanged.

&quot;We are disappointed over the schedule changes that we are announcing today,&quot; said Boeing Chairman, President and Chief Executive Officer Jim McNerney. &quot;Notwithstanding the challenges that we are experiencing in bringing forward this game-changing product, we remain confident in the design of the 787, and in the fundamental innovation and technologies that underpin it.&quot;</i>

http://boeing.com/commercial/787fami...71010d_nr.html
AAFrequentFlyer is offline  
Old Oct 10th, 2007, 03:18 PM
  #4  
 
Join Date: Jan 2003
Posts: 19,395
Received 79 Likes on 8 Posts
<i>Boeing is still promising on time delivery. They did admit that the flight tests will need some extra time but they are confident that the delivery will be on time.</i>

No, McNerny said today they would be delaying deliveries until November/December next year, around 6 mos. late.

It's still the fastener problem mainly, although some subs and vendors were taken aback by the speed of sales. Learning curves and &quot;just in time&quot; inventory management can cause trouble up and down the supply chain.

As for it being a &quot;nightmare?&quot; As if. You wanna see a nightmare? Go hang out at the ethics hearings, insider-trading proceedings, and annual shareholder meetings at EADS. Now <i>that's</i> nightmarish.
Gardyloo is online now  
Old Oct 10th, 2007, 03:20 PM
  #5  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
&lt;&lt;Boeing is still promising on time delivery.&gt;&gt;

No, they are not, read Boeing's official release to the NYSE

http://www.boeing.com/news/releases/...71010d_nr.html

&lt;&lt;Assuming that they are doing some &quot;window dressing&quot; and the testing takes some extra time, the worst case scenario is about 3 months.&gt;&gt;

No, you're incorrect again

I don't know where you're getting the information from but i think you should stick to giving out frequent flyer info and how to get from A to B.

Some of your 'facts' are completely bogus

Geordie
Geordie is online now  
Old Oct 10th, 2007, 03:26 PM
  #6  
 
Join Date: Jan 2003
Posts: 12,885
Likes: 0
Received 0 Likes on 0 Posts
beat you to it.....

in my first post I reported what I knew at the time but I did take the time and check news releases and posted it.....
AAFrequentFlyer is offline  
Old Oct 10th, 2007, 03:39 PM
  #7  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
&lt;&lt;beat you to it.....&gt;&gt;

You did, I was actually distracted by doing some 'work' before I posted.

6 months is the best case scenario, Boeing have a lot of hurdles to overcome, not least the plane is overweight and they can't fasten it together, this is before you get into the software and mechanical glitches that will occur.

I wonder how many people realised that when Boeing displayed the plane on 7/8/2007 that it was held together by temporary fasteners and that it had to be dismantled immediately after the event

Geordie
Geordie is online now  
Old Oct 10th, 2007, 04:13 PM
  #8  
 
Join Date: Jan 2003
Posts: 19,395
Received 79 Likes on 8 Posts
Geordie, perhaps you could chill it with the hyperbole? Aircraft manufacturers assemble and disassemble airframes umpteen times during prototype phases. They also make static copies of all or parts of airframes for destructive testing, as well as swapping parts and doing all sorts of production-line engineering and re-engineering. Part of the process. Delays happen. Contracts managers anticipate them.

Major sub-assemblies are being built for several more planes in the pipeline, and I see various LCFs flying around the sky all the time, full of bits and pieces for the PAE line (or deadheading back to Scotland or South Carolina or Japan...)

<i>Will it ever fly? </i>

Yeah.
Gardyloo is online now  
Old Oct 10th, 2007, 05:00 PM
  #9  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
&lt;&lt;Geordie, perhaps you could chill it with the hyperbole&gt;&gt;

Which part of my post was hyperbole?

&lt;&lt;Aircraft manufacturers assemble and disassemble airframes umpteen times during prototype phases.&gt;&gt;

Ah that explains it, they were prototyping

Geordie
Geordie is online now  
Old Oct 10th, 2007, 05:46 PM
  #10  
 
Join Date: Jan 2003
Posts: 19,395
Received 79 Likes on 8 Posts
<i>Which part of my post was hyperbole?</i>

The title, the last line, the rhetorical questions about the plane ever getting off ground, the line about &quot;how many people knew...&quot;

Perhaps we don't agree on definitions. One person's hyperbole is another's literary license I guess.

But more to the point, what's your point? Do you really think the 787 isn't going to fly? Or are you just stirring the pot?
Gardyloo is online now  
Old Oct 10th, 2007, 06:42 PM
  #11  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
Gardyloo

I think you've been on the turps again, did I write all that!

Perhaps you're getting me mixed up with the OP.

Geordie

Geordie is online now  
Old Oct 10th, 2007, 06:57 PM
  #12  
 
Join Date: Jan 2003
Posts: 20,155
Received 0 Likes on 0 Posts
Of course, Boeing had some ethics challenges not long ago.
mrwunrfl is offline  
Old Oct 10th, 2007, 06:58 PM
  #13  
 
Join Date: Jan 2003
Posts: 19,395
Received 79 Likes on 8 Posts
I did and I apologiz/s/e.
Gardyloo is online now  
Old Oct 11th, 2007, 09:31 AM
  #14  
 
Join Date: Jan 2003
Posts: 12,885
Likes: 0
Received 0 Likes on 0 Posts
<b>Geordie</b>,

I will reply to any post I feel like.

Who are you to tell me what I should/should not post about?

Get a life!
AAFrequentFlyer is offline  
Old Jan 15th, 2008, 01:40 PM
  #15  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
tick tock tick tock

Seems like another delay is to be announced

http://www.flightglobal.com/blogs/flightblogger/

and this is before a plane has been built or tested

AAFF - I have a life, I just don't play it out on internet forums

Geordie


Geordie is online now  
Old Jan 15th, 2008, 04:28 PM
  #16  
 
Join Date: Jan 2003
Posts: 20,155
Received 0 Likes on 0 Posts
Including the three additional 787s ordered by Air Pacific yesterday, there have been a total of 817 Dreamliners ordered by 55 customers.

So the sales department is doing well.
mrwunrfl is offline  
Old Feb 15th, 2008, 01:05 PM
  #17  
 
Join Date: Jan 2003
Posts: 12,885
Likes: 0
Received 0 Likes on 0 Posts
<b>Final Assembly Begins on Another Boeing 787 Dreamliner</b>

<i>Loaded snugly into the first position of the 787 production system, workers in the Everett, Wash.-based factory can now begin joining together the fuselage sections and wings. All major joins take place in this position. While this is the second of six flight-test airplanes, this Dreamliner is actually the fourth on the production line. It follows the two airplanes that will be used for static and fatigue testing.</i>

http://biz.yahoo.com/prnews/080215/aqf076.html?.v=21

btw, 857 orders from 56 airlines and counting.....

AAFrequentFlyer is offline  
Old Feb 15th, 2008, 02:41 PM
  #18  
 
Join Date: Jan 2003
Posts: 19,395
Received 79 Likes on 8 Posts
You can see the assembly stations (all occupied) from the visitor balcony during one of the factory tours offered at Everett. It's really a beautiful airplane, even compared to the occupants of the 777 line adjacent.
Gardyloo is online now  
Old Nov 20th, 2008, 06:22 PM
  #19  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
As we're coming to the end of the year, I thought I'd top this previous thread.

Maybe some predictions on the first flight or the first built plane

Mine, first shipped aircraft to airline, 1st quarter 2010

Geordie
Geordie is online now  
Old Nov 20th, 2008, 06:24 PM
  #20  
 
Join Date: Mar 2005
Posts: 1,708
Likes: 0
Received 0 Likes on 0 Posts
OOPs
I meant 1st quarter 2011

Geordie